Altea Town Hall is starting a new phase of work to upgrade the town's infrastructure and utility networks around Pont de Montcau, according to Alicante Plaza. Traffic will be closed at the junction of Pont de Montcau and calle la Séquia from Monday 16 November. Pedestrians will be able to pass through for the whole of the works.

Map: Pont de Montcau and calle la Séquia junction closure in Altea from 16 November
Photo: Costa Blanca Post

This phase covers the final sewer connections, new drinking water pipes and the last ducts for the telephone network.

The last stretch of avenida Jaime I will be closed to traffic, and vehicles leaving the area will be sent onto calle Convent. At the start of calle Alicante, a traffic light will control alternating one-way traffic, so residents of that street and the affected part of calle la Séquia can get in and out. Calle Alicante becomes a dead end. Permitted vehicles will both enter and leave through the same access point, which is controlled by traffic lights.

On the stretch of calle la Séquia heading towards Tapó del Limonero, general traffic will be restricted. Only residents and people who need access to their vados (driveway access points) will be allowed through, with entry from calle Lavadero.

Infrastructure councillor Aurora Serrat asks drivers to follow the temporary signs and traffic directions. The town hall admits the works are causing problems for residents and traders, especially on everyday journeys, and says it will post updates as the work goes on.

The town hall has not yet said how long the closure will last or what hours the restrictions apply.